Request a Consultation

Services

Database Migration & Modernization

Move to a new engine, platform or version with validated data, rehearsed cutovers and a rollback plan you have actually tested.

Open hard drive with platter and read arm in close view
0Surprises at cutover is the goal

Overview

Database migrations are among the riskiest changes an organization makes, because the data is the business and the applications on top rarely tolerate surprises. Success depends less on the copy tool and more on preparation: schema conversion, application compatibility, validation and rehearsal.

Cystem X migrates between engines, versions and platforms, including Oracle and SQL Server to PostgreSQL, on-premises to cloud and back, and legacy systems to modern managed services. We treat cutover as an engineered event with rehearsals, success criteria, a rollback path and a clear decision point.

Cross-engine conversion

On-premises to cloud

Validation & reconciliation

Low-downtime cutover

Hand holding an open hard drive
Know what you are moving
Close-up of a hard disk platter and actuator arm
Storage and performance baselines
Hard disk drive on a dark surface
Backups before anything else

How we deliver

A consistent four-stage path from first assessment to ongoing operation.

  1. Discover

    We catalog schemas, code objects, dependencies, volumes and access patterns, and classify migration risk.

  2. Convert

    Schemas, procedures and queries are converted and tested, with application changes identified early.

  3. Rehearse

    Full-scale trial migrations measure timings, find defects and prove validation rules before the real cutover.

  4. Cut over

    A scripted cutover with go or no-go checkpoints and a rollback plan moves production, followed by hypercare.

Outcomes

What changes for your organization once this service is in place.

Validated data

Row counts, checksums and business-rule checks show nothing was lost or altered.

Short downtime

Replication-based approaches shrink the cutover window to a planned, minimal interval.

Lower run cost

Modern engines and right-sized platforms reduce license and infrastructure spend.

A rehearsed rollback

If something is wrong, the way back is known and tested.

Technology

A representative slice of the platforms and tools we use for this service.

PostgreSQL Oracle SQL Server MySQL / MariaDB ora2pg AWS DMS Azure Database Migration pglogical Debezium pgBackRest Liquibase Flyway

Frameworks & standards alignment

Our delivery practices are aligned with these recognized frameworks and standards.

ISO/IEC 27001:2022 NIST CSF 2.0 CIS Controls v8 ISO/IEC 27002 controls SOC 2-aligned controls OWASP

Engagement models

Choose the model that matches where you are today, with no fixed pricing until scope is agreed.

Frequently asked questions

Can you migrate without taking our application offline?
Often yes, using continuous replication to keep the new database in sync and a short cutover. The achievable window depends on workload and application design.
What about stored procedures and vendor-specific features?
These are assessed during discovery. Many convert with tooling plus manual work, and the few that do not are flagged with options early.
How do you prove the data is the same afterwards?
We reconcile counts and checksums, compare sampled rows and run business-level queries on both systems before and after cutover.
What if the cutover goes wrong?
A rollback plan with a clear trigger is part of the cutover design, and it is rehearsed the same way as the migration itself.

Let’s engineer what’s next.

Tell us about your initiative - a solution architect will respond within one business day.